List of construction activities

  • Site cleaning
  • Bore well digging
  • Temporary Shed construction
  • Site Marking
  • Sump construction
  • Foundation digging
    •  Soil digging for Pillars
    •  Soil digging for foundation [OR] Paya
  • Start carpenter work — for window frames and door frames
  • Footing [OR] Pillar base
  • Pillars until Plinths
  • Stone Foundation [OR] paya
  • Plinth beam
  • Fill soil inside Plinths.
  • Filling cement and 40 MM Jelly on top of Soil — this will be done inside plingth area
  • Setting up main door frame and other room door frames
  • Wall construction until window frame base
  • Setup all window frames based on its sizes until 7 feet from the floor
  • Setup lintel and saja
  • Wall construction until beams
  • Setup kitchen ventilator and bathroom ventilators
  • Sheet centring for beams and also roof
    •  Fix sheets based on water level
    •  Apply plaster for the gaps between sheets
    •  Apply oil for sheets
  • Bar bending work for beams and roof
    •  Inverter beams
  • Electric pipes setup inside roof
  • Molding
  • Storing water on top of the roof
  • After 18 days remove sheet centring
  • Hocking for the roof
  • Electric pipes
    •  Clear any blockage in the roof pipes
    •  Laying electric pipes in the walls and setup electric boxes
  • Plumbing work for kitchen and bathroom
    •  Setup water pipes and sewage pipes till outside of the wall
    •  Setup Indian latrine if you are going with this option
    •  Water proofing for bathrooms
    •  Close all water and sewage pipes with temporary caps
  • Setup kitchen platform and sink
  • Tiles laying in bathroom and kitchen for walls
  • Plastering of roof and walls inside
  • Plastering of outside walls
  • Applying putty for window frames
  • Fixing window frames
  • Granite Lying
  • Granite tiles Laying in bathroom if you are going with this option
  • Fixing bathroom fittings
  • Finishing outside plumbing work and tank
  • House Elevation
  • Painting
  • Electric work
    •  Electrical wiring
    •  Dummy plate fixing/ electrical holders
    •  Electrical switches setup
  • Apply paint coating outside
  • Laying electric service wire from pole to meter board
  • Fixing meters in panel board.
  • Digging pit for power earth
  • Digging pit
  • Motor & connection to tank
  • Parking tiles
  • Compound wall
  • Sewage lines to pit

Disclaimer

Information shared in this Site is based on our own experience.Please think from your context and your circumstances. This site will give you only basic information. We do our best to correct any errors and welcome your feedback!

Search House Construction Tips

Share a word about HCT

Facebook page : HouseConstructionTips Twitter : HCTcontactus