On Top of the building

Wash Area:
  • It is advisable to keep wash area separate like below picture.
  • This kind of separation will quickly allow water to go out and roof will be clean
  • You can attach bathroom tiles for the walls so that wall will not get spoiled.
  • Consider to lay 10 MM rough granite tiles in wash area OR you can go with rough ceramic tiles.

[singlepic id=127 w=400 h=320 mode=watermark float=]

Keep the T angles in pillars.
[singlepic id=128 w=400 h=320 mode=watermark float=]
Do not allow gross or any tree to live dirctly in slab. This will make your slab week
[singlepic id=333 w=400 h=320 mode=watermark float=]
Dummy pillars construction:
[singlepic id=299 w=400 h=320 mode=watermark float=]
[singlepic id=298 w=400 h=320 mode=watermark float=]
This dummy pillar is prepared with waste sand. In case if you are using T angle, use good sand and jelly for concrete. So that it will sustain for rough usage
[singlepic id=297 w=400 h=320 mode=watermark float=]
Fortified wall on top of the building
[singlepic id=312 w=400 h=320 mode=watermark float=]
Muddy on top of the building:
[singlepic id=446 w=400 h=320 mode=watermark float=]
[singlepic id=447 w=400 h=320 mode=watermark float=]
[singlepic id=448 w=400 h=320 mode=watermark float=]